Site clearance in Bo Put, Chaweng - Koh Samui
Full site clearance in Bo Put near Chaweng, Koh Samui. Felled trees, extracted giant stumps, cleared palms and vegetation, leveled the ground - ready for construction in three days.

Site clearance in Nathon - trees, roots and wire removal
One-day rough clearance of an overgrown plot in Nathon: trees, roots, debris and a large mass of tangled wires removed. The client's construction team moved in the same day.

Pool pit excavation in Nathon, Koh Samui
Dug a pool pit to the client's specified dimensions in Nathon, near Coconut Museum Samui. Two days including rain delays - excavation done to spec, spoil hauled off site.

Land clearing for villa construction in Hua Thanon
Two-day land clearance on an overgrown plot in Hua Thanon. Removed trees, palms and roots, cleared undergrowth, leveled sand mounds and hauled all waste off site.

Steel arch and metalwork delivery for a residential build in Chaweng
Delivered custom semicircular steel arches for the entrance door and window openings to a private villa build in Chaweng, Koh Samui. Loaded, transported and unloaded without damage - job done in a couple of hours.

Crocodile transport from Koh Samui to Phuket
Unusual cargo: Samui Crocodile Farm commissioned us to transport a batch of crocodiles from Koh Samui to Phuket. Permits in hand, trucks covered with tarpaulins, night loading - every crocodile delivered safely.

Stone relocation and path clearance to a waterfall in Chaweng hills
Cleared a path through dense hillside vegetation to a waterfall at a private villa in the Chaweng hills, relocated large stones up the slope and arranged them as the first phase of a planned waterfall rest area - done in one day.

House demolition, backfill and site leveling in Lipa Noi
Demolished an old stilt house, cleared trees and palms, removed all debris, brought in fill and raised the plot level by around 40 cm - full site preparation in five days in Lipa Noi, Koh Samui.

Regular steel structure deliveries to a construction site in Chong Mon
Ongoing steel structure deliveries for a long-term client's construction project in Chong Mon, Koh Samui - regular runs, on schedule every time, using both 6-wheel and 10-wheel trucks depending on the load.

Construction groundwork support for a residential build in Chaweng
Long-term construction groundwork support for a repeat client in Chaweng - site leveling, soil removal, foundation excavation, pile support, utility trenching and drainage.

Drainage, backfill and leveling on a waterlogged plot in Maenam
Full drainage and backfill project on a 2-rai waterlogged plot in Maenam: vegetation cleared, drainage channel opened and deepened, pipe laid under the road, approximately 1000 m³ of fill brought in over 200 truck runs to raise and level the site.