[{"data":1,"prerenderedAt":249},["ShallowReactive",2],{"project-en-plai-laem-waste-removal":3,"project-related-en-plai-laem-waste-removal":79},{"id":4,"title":5,"beforeAfter":6,"body":12,"cover":52,"date":53,"description":18,"equipment":54,"extension":57,"gallery":58,"location":68,"meta":69,"navigation":70,"path":71,"seo":72,"service":73,"sitemap":74,"slug":75,"stem":76,"summary":77,"__hash__":78},"projects_en\u002Fprojects\u002Fplai-laem-waste-removal.md","Waste clearance and removal from a plot in Plai Laem",[7],{"beforeImage":8,"beforeAlt":9,"afterImage":10,"afterAlt":11},"\u002Fimages\u002Fprojects\u002Fplai-laem-waste-removal\u002Fbefore\u002Fbefore-1.webp","Plot covered in construction and household waste","\u002Fimages\u002Fprojects\u002Fplai-laem-waste-removal\u002Fafter\u002Fafter-1.webp","The same plot after clearance and grading",{"type":13,"value":14,"toc":46},"minimark",[15,19,22,27,30,33,36,40,43],[16,17,18],"p",{},"The client came to us with a simple brief: the plot is covered in waste, make it go away. Construction offcuts, old household items, weeds growing over the top of it all - the usual story for land nobody has dealt with for a while.",[16,20,21],{},"Jobs like this tend to get put off: the volume looks small, but clearing it by hand is slow and unpleasant work. With machinery it takes a shift.",[23,24,26],"h2",{"id":25},"how-we-did-it","How we did it",[16,28,29],{},"A compact Yanmar excavator and a six-wheel dump truck came onto the plot in the morning.",[16,31,32],{},"The excavator beats hand-clearing here: the bucket picks up mixed rubbish together with the layer of topsoil it has sunk into, and loads it straight into the truck. The truck ran to the landfill and back - several trips across the day.",[16,34,35],{},"Once the plot was empty, we went over the surface with the excavator and graded it out. It's a small thing that matters: clearance leaves holes and heaps behind, and if you don't touch them the plot looks little better than it did before.",[23,37,39],{"id":38},"result","Result",[16,41,42],{},"One day - and instead of a dump site, a clean, level plot. All the waste went to the landfill and was disposed of properly, not dropped off \"somewhere\". The client signed the job off the same evening.",[16,44,45],{},"Need waste removed or a plot cleared on Koh Samui? Get in touch - smaller jobs we close in a single visit rather than dragging them across a week.",{"title":47,"searchDepth":48,"depth":48,"links":49},"",2,[50,51],{"id":25,"depth":48,"text":26},{"id":38,"depth":48,"text":39},"\u002Fimages\u002Fprojects\u002Fplai-laem-waste-removal\u002Fhero.webp","2026-06-25",[55,56],"yanmar-b32","hino-300","md",[59,62,65],{"src":60,"alt":61},"\u002Fimages\u002Fprojects\u002Fplai-laem-waste-removal\u002Fplot-before-cleanup.webp","The cluttered plot in Plai Laem before the clean-up began",{"src":63,"alt":64},"\u002Fimages\u002Fprojects\u002Fplai-laem-waste-removal\u002Floading-truck-at-the-dump.webp","Tipping the waste from the dump truck at the landfill",{"src":66,"alt":67},"\u002Fimages\u002Fprojects\u002Fplai-laem-waste-removal\u002Fcleared-plot-result.webp","The plot after clearance - waste removed and the ground graded","Plai Laem, Koh Samui",{},true,"\u002Fprojects\u002Fplai-laem-waste-removal",{"title":5,"description":18},"land-clearing",{"loc":71},"plai-laem-waste-removal","projects\u002Fplai-laem-waste-removal","One-day clean-up of a waste-covered plot in Plai Laem: everything collected, hauled to the landfill and the surface graded. Done with a compact Yanmar excavator and a six-wheel dump truck.","K_Nuql_khvcsayNXnIramJ0sa16F1kd5Iu7smKvOLkY",[80,177],{"id":81,"title":82,"beforeAfter":83,"body":104,"cover":142,"date":143,"description":108,"equipment":144,"extension":57,"gallery":146,"location":168,"meta":169,"navigation":70,"path":170,"seo":171,"service":73,"sitemap":172,"slug":173,"stem":174,"summary":175,"__hash__":176},"projects_en\u002Fprojects\u002Fsite-clearance-bo-put-july.md","Site clearance in Bo Put, Chaweng - Koh Samui",[84,89,94,99],{"beforeImage":85,"beforeAlt":86,"afterImage":87,"afterAlt":88},"\u002Fimages\u002Fprojects\u002Fsite-clearance-bo-put-july\u002Fbefore\u002Fbefore-1.webp","Dense vegetation covering the plot before clearance","\u002Fimages\u002Fprojects\u002Fsite-clearance-bo-put-july\u002Fafter\u002Fafter-1.webp","Plot cleared and leveled after day one",{"beforeImage":90,"beforeAlt":91,"afterImage":92,"afterAlt":93},"\u002Fimages\u002Fprojects\u002Fsite-clearance-bo-put-july\u002Fbefore\u002Fbefore-2.webp","Overgrown section with large trees and palms","\u002Fimages\u002Fprojects\u002Fsite-clearance-bo-put-july\u002Fafter\u002Fafter-2.webp","Same section cleared, stumps removed, ground exposed",{"beforeImage":95,"beforeAlt":96,"afterImage":97,"afterAlt":98},"\u002Fimages\u002Fprojects\u002Fsite-clearance-bo-put-july\u002Fbefore\u002Fbefore-3.webp","Trees and palms covering the plot before work started","\u002Fimages\u002Fprojects\u002Fsite-clearance-bo-put-july\u002Fafter\u002Fafter-3.webp","Area fully cleared and ready for leveling",{"beforeImage":100,"beforeAlt":101,"afterImage":102,"afterAlt":103},"\u002Fimages\u002Fprojects\u002Fsite-clearance-bo-put-july\u002Fbefore\u002Fbefore-4.webp","Plot perimeter overgrown before work started","\u002Fimages\u002Fprojects\u002Fsite-clearance-bo-put-july\u002Fafter\u002Fafter-4.webp","Perimeter cleared, clean ground level achieved",{"type":13,"value":105,"toc":138},[106,109,112,116,119,122,125,129,132,135],[16,107,108],{},"The client - a developer with an active construction portfolio on the island - called us at 9 in the morning. By 11 we were on site together, walking the plot and agreeing on the scope. That evening we mobilised the machinery. Work started the next morning, and three days later the site was clear.",[16,110,111],{},"The plot is in Bo Put, close to the temple เจดีย์ศรีสุคตคีรี (เจดีย์เขาหัวจุก) in the Chaweng area. It was heavily overgrown - large trees and palms with deep root systems, uneven ground throughout. The kind of site where you need the right combination of machines and a crew that works at pace.",[23,113,115],{"id":114},"how-the-work-was-done","How the work was done",[16,117,118],{},"Before mobilising, we assessed the site and made a deliberate call on equipment. The tractor would handle the bulk of the clearing - pushing, dragging and moving vegetation across the plot. A compact excavator was enough for the large stumps and root extraction; there was no need for a full-size machine. That decision saved the client money on equipment hire, and it meant we could deliver the Yanmar B32 on the same Hino 300 truck that was already working the site - no separate low-loader required.",[16,120,121],{},"The Kubota L3608 tractor worked continuously, dragging felled logs and pushing material into loading position. The Hino 300 ran trips to haul everything off site between deliveries.",[16,123,124],{},"Some of the stumps were exceptional in size - one was bigger than the driver standing next to it. Getting those out cleanly without damaging the surrounding ground takes patience and the right angle of attack with the bucket.",[23,126,128],{"id":127},"three-days-clean-result","Three days, clean result",[16,130,131],{},"Day one: felling, initial clearing, start on the large stumps.\nDay two: stump extraction, trees and palms cleared, rough leveling.\nDay three: final leveling, cleanup, waste removal complete.",[16,133,134],{},"The client walked the site at the end of day three and confirmed everything was done to spec. He also proposed continuing the collaboration into the construction phase - the kind of outcome that comes from working fast and keeping the site in order throughout.",[16,136,137],{},"Site clearance in Bo Put, Chaweng or anywhere on Koh Samui at this pace is possible when the crew knows what they're doing and the machinery matches the job. If you need a plot cleared, get in touch - we can usually mobilise within 24 hours.",{"title":47,"searchDepth":48,"depth":48,"links":139},[140,141],{"id":114,"depth":48,"text":115},{"id":127,"depth":48,"text":128},"\u002Fimages\u002Fprojects\u002Fsite-clearance-bo-put-july\u002Fhero.webp","2026-07-10",[55,145,56],"kubota-l3608",[147,150,153,156,159,162,165],{"src":148,"alt":149},"\u002Fimages\u002Fprojects\u002Fsite-clearance-bo-put-july\u002Fplot-before-clearance.webp","Overgrown plot in Bo Put before clearance work began",{"src":151,"alt":152},"\u002Fimages\u002Fprojects\u002Fsite-clearance-bo-put-july\u002Fexcavator-cab-view-during-work.webp","View from the excavator cab during active site clearance",{"src":154,"alt":155},"\u002Fimages\u002Fprojects\u002Fsite-clearance-bo-put-july\u002Fdigging-out-large-tree-stump.webp","Excavator digging out a massive tree stump from the plot",{"src":157,"alt":158},"\u002Fimages\u002Fprojects\u002Fsite-clearance-bo-put-july\u002Fgiant-stump-bigger-than-driver.webp","A tree stump larger than the driver - scale of the vegetation on site",{"src":160,"alt":161},"\u002Fimages\u002Fprojects\u002Fsite-clearance-bo-put-july\u002Ftractor-pulling-log.webp","Kubota tractor pulling a large felled log across the cleared area",{"src":163,"alt":164},"\u002Fimages\u002Fprojects\u002Fsite-clearance-bo-put-july\u002Floading-trees-and-stumps-into-truck.webp","Loading felled trees and stumps into the Hino 300 truck for removal",{"src":166,"alt":167},"\u002Fimages\u002Fprojects\u002Fsite-clearance-bo-put-july\u002Fcleared-plot-result.webp","Final result - clean, level plot in Bo Put ready for construction","Bo Put, Koh Samui",{},"\u002Fprojects\u002Fsite-clearance-bo-put-july",{"title":82,"description":108},{"loc":170},"site-clearance-bo-put-july","projects\u002Fsite-clearance-bo-put-july","Full site clearance in Bo Put near Chaweng, Koh Samui. Felled trees, extracted giant stumps, cleared palms and vegetation, leveled the ground - ready for construction in three days.","vo2r0WQi-zmFqPhUDj--_hwrTY4GqkpQJU0MYt3YMQ4",{"id":178,"title":179,"beforeAfter":180,"body":181,"cover":222,"date":223,"description":224,"equipment":225,"extension":57,"gallery":227,"location":240,"meta":241,"navigation":70,"path":242,"seo":243,"service":73,"sitemap":244,"slug":245,"stem":246,"summary":247,"__hash__":248},"projects_en\u002Fprojects\u002Fnathon-site-clearance-june.md","Site clearance in Nathon - trees, roots and wire removal",null,{"type":13,"value":182,"toc":218},[183,192,195,199,202,205,209,212,215],[16,184,185,186,191],{},"This job came from proximity. While we were finishing the ",[187,188,190],"a",{"href":189},"\u002Fprojects\u002Fnathon-pool-excavation","pool pit excavation on the neighbouring plot",", the owner of the adjacent site came over and asked if we could handle his plot. The excavator was already on site, no delivery needed - we wrapped up the first job and moved straight across.",[16,193,194],{},"That's a pattern we see regularly: once a crew is working in an area and the neighbours can see the pace and quality of the work, they want to use the same team. It saves time for everyone.",[23,196,198],{"id":197},"what-needed-to-come-out","What needed to come out",[16,200,201],{},"The plot was heavily cluttered. Trees and root systems were the main task for the excavator. But the unusual element here was the wires - a large, tangled mass of cables had accumulated on the site, twisted through the vegetation. Getting those out cleanly without damaging the surrounding area required care.",[16,203,204],{},"The brief was rough clearance: large trees, root extraction, debris piles and the wire mass. The goal was to hand the site to the client's construction team in a state where they could begin their prep work.",[23,206,208],{"id":207},"one-day","One day",[16,210,211],{},"The Komatsu PC128 worked through the site systematically. Trees felled, roots extracted, debris and wire loaded out. By the end of the day the plot was clear.",[16,213,214],{},"The client's builders were on site the following morning. That turnaround - from cluttered to construction-ready in a single working day - is what makes a project like this worthwhile for everyone involved.",[16,216,217],{},"If your plot needs a rough clearance before construction begins, get in touch. If we're already working nearby, we can often start the same day.",{"title":47,"searchDepth":48,"depth":48,"links":219},[220,221],{"id":197,"depth":48,"text":198},{"id":207,"depth":48,"text":208},"\u002Fimages\u002Fprojects\u002Fnathon-site-clearance-june\u002Fhero.webp","2026-06-15","This job came from proximity. While we were finishing the pool pit excavation on the neighbouring plot, the owner of the adjacent site came over and asked if we could handle his plot. The excavator was already on site, no delivery needed - we wrapped up the first job and moved straight across.",[226],"komatsu-pc128us",[228,231,234,237],{"src":229,"alt":230},"\u002Fimages\u002Fprojects\u002Fnathon-site-clearance-june\u002Ftangled-wires-and-trees.webp","Dense tangle of wires and overgrown trees covering the site before clearance",{"src":232,"alt":233},"\u002Fimages\u002Fprojects\u002Fnathon-site-clearance-june\u002Fexcavating-roots.webp","Komatsu PC128 excavating deep root systems from the plot",{"src":235,"alt":236},"\u002Fimages\u002Fprojects\u002Fnathon-site-clearance-june\u002Fclearing-debris-pile.webp","Clearing a large pile of construction debris and waste from the site",{"src":238,"alt":239},"\u002Fimages\u002Fprojects\u002Fnathon-site-clearance-june\u002Fresult-cleared-site.webp","Site after clearance - clean ground ready for the construction team to move in","Nathon, Koh Samui",{},"\u002Fprojects\u002Fnathon-site-clearance-june",{"title":179,"description":224},{"loc":242},"nathon-site-clearance-june","projects\u002Fnathon-site-clearance-june","One-day rough clearance of an overgrown plot in Nathon: trees, roots, debris and a large mass of tangled wires removed. The client's construction team moved in the same day.","iHcJXvCxKzZzDlhgQcO1WAyLaalGG0DfzCaN7O_1DhI",1785946165698]