[{"data":1,"prerenderedAt":218},["ShallowReactive",2],{"equipment-projects-en-kubota-l3608":3},[4,120],{"id":5,"title":6,"beforeAfter":7,"body":28,"cover":81,"date":82,"description":34,"equipment":83,"extension":89,"gallery":90,"location":109,"meta":110,"navigation":111,"path":112,"seo":113,"service":114,"sitemap":115,"slug":116,"stem":117,"summary":118,"__hash__":119},"projects_en\u002Fprojects\u002Fmaenam-drainage-and-fill.md","Drainage, backfill and leveling on a waterlogged plot in Maenam",[8,13,18,23],{"beforeImage":9,"beforeAlt":10,"afterImage":11,"afterAlt":12},"\u002Fimages\u002Fprojects\u002Fmaenam-drainage-and-fill\u002Fbefore\u002Fbefore-1.webp","Waterlogged, overgrown plot in Maenam before any work began","\u002Fimages\u002Fprojects\u002Fmaenam-drainage-and-fill\u002Fafter\u002Fafter-1.webp","Same area after drainage work, backfill and leveling",{"beforeImage":14,"beforeAlt":15,"afterImage":16,"afterAlt":17},"\u002Fimages\u002Fprojects\u002Fmaenam-drainage-and-fill\u002Fbefore\u002Fbefore-2.webp","Dense vegetation and standing water covering the plot","\u002Fimages\u002Fprojects\u002Fmaenam-drainage-and-fill\u002Fafter\u002Fafter-2.webp","Plot cleared, filled and leveled - dry and ready for use",{"beforeImage":19,"beforeAlt":20,"afterImage":21,"afterAlt":22},"\u002Fimages\u002Fprojects\u002Fmaenam-drainage-and-fill\u002Fbefore\u002Fbefore-3.webp","Boggy ground and overgrown watercourse before drainage works","\u002Fimages\u002Fprojects\u002Fmaenam-drainage-and-fill\u002Fafter\u002Fafter-3.webp","Drainage channel cleared and deepened, area backfilled",{"beforeImage":24,"beforeAlt":25,"afterImage":26,"afterAlt":27},"\u002Fimages\u002Fprojects\u002Fmaenam-drainage-and-fill\u002Fbefore\u002Fbefore-4.webp","Fourth view of the plot in its original waterlogged state","\u002Fimages\u002Fprojects\u002Fmaenam-drainage-and-fill\u002Fafter\u002Fafter-4.webp","Final leveled surface after completing all drainage and fill works",{"type":29,"value":30,"toc":73},"minimark",[31,35,38,43,46,50,53,56,60,63,67,70],[32,33,34],"p",{},"A 2-rai plot - roughly 3,200 m² - in Maenam. The ground was waterlogged and boggy, with dense vegetation covering most of it and a blocked natural watercourse running through the site. No drainage, nowhere for the water to go. The task: open the drainage, clear the land, bring in fill and raise the level so the plot could be used.",[32,36,37],{},"This was one of the most demanding projects we've taken on. Nearly every piece of equipment we operate was deployed here at some point.",[39,40,42],"h2",{"id":41},"drainage-first","Drainage first",[32,44,45],{},"Before any fill could go in, the water had to have somewhere to go. We cleared and deepened the existing drainage channel, restoring the natural watercourse. The critical part was getting the water off the plot entirely: we installed a drainage pipe under the road so the channel could flow through rather than backing up. Until that pipe was in and working, the site couldn't drain.",[39,47,49],{"id":48},"finding-and-moving-the-soil","Finding and moving the soil",[32,51,52],{},"With a project requiring around 1,000 m³ of fill, sourcing the material efficiently mattered. We located a quarry and positioned our Caterpillar 305CR there permanently to load the trucks. The Hino 300 and Hino Super FM18 ran 200 trips between the quarry and the site over the course of the project - a constant loop of loading, hauling and returning.",[32,54,55],{},"Rain extended the timeline to close to a month. A waterlogged site during heavy rain is a different environment to work in: the ground shifts, access becomes difficult and the machinery has to be managed more carefully. We worked around the weather as much as possible and kept moving.",[39,57,59],{"id":58},"spreading-and-leveling","Spreading and leveling",[32,61,62],{},"On site, the Komatsu PC128 and the Kubota tractor worked together - the tractor pushing and spreading the incoming fill across the plot, the excavator leveling and compacting. Raising a boggy plot by enough to make it usable requires consistent passes and attention to where the material settles.",[39,64,66],{"id":65},"result","Result",[32,68,69],{},"The drainage channel flows. The road pipe is in. Approximately 1,000 m³ of fill brought in across 200 truck runs. The plot went from a waterlogged, overgrown bog to a cleared, leveled and draining site ready for its next use.",[32,71,72],{},"Complex drainage and earthworks on difficult terrain anywhere on Koh Samui - get in touch.",{"title":74,"searchDepth":75,"depth":75,"links":76},"",2,[77,78,79,80],{"id":41,"depth":75,"text":42},{"id":48,"depth":75,"text":49},{"id":58,"depth":75,"text":59},{"id":65,"depth":75,"text":66},"\u002Fimages\u002Fprojects\u002Fmaenam-drainage-and-fill\u002Fhero.webp","2026-02-02",[84,85,86,87,88],"komatsu-pc128us","caterpillar-305cr","hino-300","hino-super-fm18","kubota-l3608","md",[91,94,97,100,103,106],{"src":92,"alt":93},"\u002Fimages\u002Fprojects\u002Fmaenam-drainage-and-fill\u002Fexcavator-cleared-vegetation-exposed-ground.webp","Excavator cleared the dense vegetation, exposing the waterlogged ground beneath",{"src":95,"alt":96},"\u002Fimages\u002Fprojects\u002Fmaenam-drainage-and-fill\u002Fclearing-and-deepening-drainage-channel.webp","Clearing and deepening the drainage channel to open the natural watercourse",{"src":98,"alt":99},"\u002Fimages\u002Fprojects\u002Fmaenam-drainage-and-fill\u002Fdrainage-pipe-installed-under-road.webp","Drainage pipe installed under the road to allow water to exit the plot",{"src":101,"alt":102},"\u002Fimages\u002Fprojects\u002Fmaenam-drainage-and-fill\u002Fcat305-loading-soil-at-quarry.webp","Caterpillar 305CR working at the quarry, loading soil onto our trucks",{"src":104,"alt":105},"\u002Fimages\u002Fprojects\u002Fmaenam-drainage-and-fill\u002Ftractor-pushing-soil-across-plot.webp","Tractor pushing and spreading imported fill across the plot",{"src":107,"alt":108},"\u002Fimages\u002Fprojects\u002Fmaenam-drainage-and-fill\u002Fpc128-helping-tractor-level-ground.webp","Komatsu PC128 working alongside the tractor to level and compact the fill","Maenam, Koh Samui",{},true,"\u002Fprojects\u002Fmaenam-drainage-and-fill",{"title":6,"description":34},"drainage",{"loc":112},"maenam-drainage-and-fill","projects\u002Fmaenam-drainage-and-fill","Full drainage and backfill project on a 2-rai waterlogged plot in Maenam: vegetation cleared, drainage channel opened and deepened, pipe laid under the road, approximately 1000 m³ of fill brought in over 200 truck runs to raise and level the site.","6eajvWVongMFw9JI8iSmEHrCtJo_T2vc6ZAQ8Msp59U",{"id":121,"title":122,"beforeAfter":123,"body":144,"cover":182,"date":183,"description":148,"equipment":184,"extension":89,"gallery":186,"location":208,"meta":209,"navigation":111,"path":210,"seo":211,"service":212,"sitemap":213,"slug":214,"stem":215,"summary":216,"__hash__":217},"projects_en\u002Fprojects\u002Fsite-clearance-bo-put-july.md","Site clearance in Bo Put, Chaweng - Koh Samui",[124,129,134,139],{"beforeImage":125,"beforeAlt":126,"afterImage":127,"afterAlt":128},"\u002Fimages\u002Fprojects\u002Fsite-clearance-bo-put-july\u002Fbefore\u002Fbefore-1.webp","Dense vegetation covering the plot before clearance","\u002Fimages\u002Fprojects\u002Fsite-clearance-bo-put-july\u002Fafter\u002Fafter-1.webp","Plot cleared and leveled after day one",{"beforeImage":130,"beforeAlt":131,"afterImage":132,"afterAlt":133},"\u002Fimages\u002Fprojects\u002Fsite-clearance-bo-put-july\u002Fbefore\u002Fbefore-2.webp","Overgrown section with large trees and palms","\u002Fimages\u002Fprojects\u002Fsite-clearance-bo-put-july\u002Fafter\u002Fafter-2.webp","Same section cleared, stumps removed, ground exposed",{"beforeImage":135,"beforeAlt":136,"afterImage":137,"afterAlt":138},"\u002Fimages\u002Fprojects\u002Fsite-clearance-bo-put-july\u002Fbefore\u002Fbefore-3.webp","Trees and palms covering the plot before work started","\u002Fimages\u002Fprojects\u002Fsite-clearance-bo-put-july\u002Fafter\u002Fafter-3.webp","Area fully cleared and ready for leveling",{"beforeImage":140,"beforeAlt":141,"afterImage":142,"afterAlt":143},"\u002Fimages\u002Fprojects\u002Fsite-clearance-bo-put-july\u002Fbefore\u002Fbefore-4.webp","Plot perimeter overgrown before work started","\u002Fimages\u002Fprojects\u002Fsite-clearance-bo-put-july\u002Fafter\u002Fafter-4.webp","Perimeter cleared, clean ground level achieved",{"type":29,"value":145,"toc":178},[146,149,152,156,159,162,165,169,172,175],[32,147,148],{},"The client - a developer with an active construction portfolio on the island - called us at 9 in the morning. By 11 we were on site together, walking the plot and agreeing on the scope. That evening we mobilised the machinery. Work started the next morning, and three days later the site was clear.",[32,150,151],{},"The plot is in Bo Put, close to the temple เจดีย์ศรีสุคตคีรี (เจดีย์เขาหัวจุก) in the Chaweng area. It was heavily overgrown - large trees and palms with deep root systems, uneven ground throughout. The kind of site where you need the right combination of machines and a crew that works at pace.",[39,153,155],{"id":154},"how-the-work-was-done","How the work was done",[32,157,158],{},"Before mobilising, we assessed the site and made a deliberate call on equipment. The tractor would handle the bulk of the clearing - pushing, dragging and moving vegetation across the plot. A compact excavator was enough for the large stumps and root extraction; there was no need for a full-size machine. That decision saved the client money on equipment hire, and it meant we could deliver the Yanmar B32 on the same Hino 300 truck that was already working the site - no separate low-loader required.",[32,160,161],{},"The Kubota L3608 tractor worked continuously, dragging felled logs and pushing material into loading position. The Hino 300 ran trips to haul everything off site between deliveries.",[32,163,164],{},"Some of the stumps were exceptional in size - one was bigger than the driver standing next to it. Getting those out cleanly without damaging the surrounding ground takes patience and the right angle of attack with the bucket.",[39,166,168],{"id":167},"three-days-clean-result","Three days, clean result",[32,170,171],{},"Day one: felling, initial clearing, start on the large stumps.\nDay two: stump extraction, trees and palms cleared, rough leveling.\nDay three: final leveling, cleanup, waste removal complete.",[32,173,174],{},"The client walked the site at the end of day three and confirmed everything was done to spec. He also proposed continuing the collaboration into the construction phase - the kind of outcome that comes from working fast and keeping the site in order throughout.",[32,176,177],{},"Site clearance in Bo Put, Chaweng or anywhere on Koh Samui at this pace is possible when the crew knows what they're doing and the machinery matches the job. If you need a plot cleared, get in touch - we can usually mobilise within 24 hours.",{"title":74,"searchDepth":75,"depth":75,"links":179},[180,181],{"id":154,"depth":75,"text":155},{"id":167,"depth":75,"text":168},"\u002Fimages\u002Fprojects\u002Fsite-clearance-bo-put-july\u002Fhero.webp","2026-07-10",[185,88,86],"yanmar-b32",[187,190,193,196,199,202,205],{"src":188,"alt":189},"\u002Fimages\u002Fprojects\u002Fsite-clearance-bo-put-july\u002Fplot-before-clearance.webp","Overgrown plot in Bo Put before clearance work began",{"src":191,"alt":192},"\u002Fimages\u002Fprojects\u002Fsite-clearance-bo-put-july\u002Fexcavator-cab-view-during-work.webp","View from the excavator cab during active site clearance",{"src":194,"alt":195},"\u002Fimages\u002Fprojects\u002Fsite-clearance-bo-put-july\u002Fdigging-out-large-tree-stump.webp","Excavator digging out a massive tree stump from the plot",{"src":197,"alt":198},"\u002Fimages\u002Fprojects\u002Fsite-clearance-bo-put-july\u002Fgiant-stump-bigger-than-driver.webp","A tree stump larger than the driver - scale of the vegetation on site",{"src":200,"alt":201},"\u002Fimages\u002Fprojects\u002Fsite-clearance-bo-put-july\u002Ftractor-pulling-log.webp","Kubota tractor pulling a large felled log across the cleared area",{"src":203,"alt":204},"\u002Fimages\u002Fprojects\u002Fsite-clearance-bo-put-july\u002Floading-trees-and-stumps-into-truck.webp","Loading felled trees and stumps into the Hino 300 truck for removal",{"src":206,"alt":207},"\u002Fimages\u002Fprojects\u002Fsite-clearance-bo-put-july\u002Fcleared-plot-result.webp","Final result - clean, level plot in Bo Put ready for construction","Bo Put, Koh Samui",{},"\u002Fprojects\u002Fsite-clearance-bo-put-july",{"title":122,"description":148},"land-clearing",{"loc":210},"site-clearance-bo-put-july","projects\u002Fsite-clearance-bo-put-july","Full site clearance in Bo Put near Chaweng, Koh Samui. Felled trees, extracted giant stumps, cleared palms and vegetation, leveled the ground - ready for construction in three days.","vo2r0WQi-zmFqPhUDj--_hwrTY4GqkpQJU0MYt3YMQ4",1781969629000]